Featured Projects by Boiler Supply

 

Marriott Marquis - Atlanta, GA

In three weeks, Boiler Supply Company removed existing boiler controls and installed Cleaver-Brooks Hawk ICS Controls on three boilers while upgrading the boiler room to meet current and future demands.

Client Testimonial

“The controls upgrade project on three Cleaver Brooks boilers with communications, as well as VSD, Parallel Positioning and O2 trim had no start up problems. We added the Level Masters on the boilers and they have really contributed to boiler room accountability. The engineering team was excited about the new controls from Cleaver Brooks.” - Larry Kirby

 

Westin Peachtree Hotel – Atlanta, Georgia

Boiler Supply Company removed the existing boiler wall refractory units and upgraded the two Industrial Watertube Nebraska boilers through the installation of new OEM Nebraska replacement wall refractory in six weeks time.

Client Testimonial

“The refractory had been replaced recently and was failing again. We were asked what could be done and we proposed OEM replacement refractory. They engineering team was very impressed with the package as well as the quality of the job.” - Larry Kirby

 

Oak Ridge National Laboratory – BWXT-Y12

In collaboration with wrecking/demolition contractor Pas-Coy, Boiler Supply Company is involved in an energy use reduction project to replace outdated units with four 80,000 lbs/hour Industrial Watertube boilers equipped with Economizers and two Cleaver Brooks Tray Deaerators.

Client Testimonial

“If properly maintained, the life expectancy of the boilers to be removed is between twenty and forty years. Like computers, new technology makes the replacement boilers so much more efficient, with greater fuel savings and less maintenance required. There’s no telling how much will be saved in operational costs or how long these energy savers can last.” - Mike Lawson

 

Clark Atlanta University – Atlanta, Georgia

In order to save money by reducing energy costs, Clark Atlanta University (CAU) teamed with two Atlanta-area firms, ESG (Energy Systems Group) and Griffith Engineering, to develop a dual-fuel system that allowed switching between electric and natural gas fuel depending on utility rates. Power costs are monitored for the following day and a decision is made between the two fuel sources based on a computer cost model.

Boiler Supply was contracted to install a Cleaver-Brooks/AMCE Electrode boiler and two Nebraska Industrial Waterlube boilers. The installation and startup was completed in four months.

Client Testimonial

“The process of working on the specification and sale of the CAU project was most enjoyable. The end user listened to our equipment recommendations to use proven quality and buy from a source with local support and service to help care for the long-term use of the boilers. The electrode boiler technology is impressive, with the unit’s capability to go from low fire to full capacity in 90 seconds. The Nebraska boilers were designed to fit in the old existing space and use all the latest energy saving features and reduce emissions at the plant.” - Marc Vepraskas