Boiler System Relocation Boosts Efficiency for a Georgia Manufacturer

Share

Location: Thomson, GA
Industry: Manufacturing / Textiles
Date Completed: Fall 2024 – Winter 2025

A manufacturing facility in Thomson, GA had been relying on an aging 750 HP Johnston firetube boiler for several years. While numerous upgrades and repairs were proposed over time, the need for a full replacement became increasingly urgent. In late 2024, the facility identified an opportunity to replace the system using high-efficiency equipment from another plant that had recently closed operations in California.

The California site had operated two nearly new Cleaver-Brooks FLX 440 HP watertube boilers for less than a year. The goal was to remove this equipment, transport it across the country, and integrate it into the Thomson plant—replacing the outdated boiler system and optimizing overall performance.

The Boiler Supply team managed the entire project scope, including:

Decommissioning & Transport
Coordinated removal and shipment of:

  • Two Cleaver-Brooks FLX watertube boilers (440 HP each)
  • Two economizers
  • Supporting components

Installation

  • Installed both Cleaver-Brooks FLX units
  • Re-used the existing Deaerator system, relocating it to the mezzanine for better space utilization
  • Installed the economizers to enhance system efficiency

Commissioning & Inspection

  • Provided full startup, testing, and inspection of all equipment to ensure reliable operation.

This strategic relocation allowed the facility to:

  • Maximize the use of existing high-value equipment
  • Avoid the cost of new boiler purchases
  • Upgrade from a single firetube to two high-efficiency watertube boilers
  • Improve system redundancy and reliability
  • Enhance energy performance with economizers
  • Complete the project on schedule and within budget

Looking to relocate or upgrade your boiler plant equipment?
We handle everything from demolition and transportation to installation and startup. Contact us to learn more.

View pictures of the entire project from the equipment removal, new equipment transport, installation and startup.