Project Highlight: Increased Steam Capacity at an Industrial Facility
Customer: Pharmaceutical Manufacturing Facility
Location: Gainesville, GA
Keeping steam available was critical for this animal pharmaceutical manufacturing facility, where production could not be interrupted during a planned boiler replacement.
The existing 35-year-old, 100 HP Cleaver-Brooks firetube steam boiler had reached the end of its service life and was replaced with a new 200 HP Cleaver-Brooks CBEX steam boiler featuring the advanced HAWK 1000 control system.
Maintaining Plant Operations
Because continuous operation was essential, our team developed a detailed installation strategy that prioritized reliability and minimized risk.
A temporary rental boiler was installed as a backup, ensuring the facility could maintain steam production if the remaining plant boiler experienced an unexpected outage.
The project presented an unexpected challenge. Over the years, facility renovations eliminated the original path used to move equipment into and out of the boiler room.
Creative Rigging Solution
After evaluating several options, our team developed a unique rigging plan. A section of the exterior wall was removed so cranes and aerial lifts could safely remove the old boiler and position the new CBEX unit inside.
Every phase of the project—from engineering and logistics to rigging and installation—was carefully planned to ensure the replacement could be completed safely and efficiently.
The rigging operation alone required a full day of planning and execution. Because of the crane height and proximity to a neighboring airport, coordination with airport officials was also necessary before work could begin.

The New Boiler Solution
The project included:
- Removal of a 35-year-old 100 HP Cleaver-Brooks firetube steam boiler
- Installation of a new 200 HP Cleaver-Brooks CBEX steam boiler
- Upgrade to the Cleaver-Brooks HAWK 1000 control system
- Temporary rental boiler installation to provide backup steam capacity during the project
- Crane, rigging, and lift coordination for boiler removal and installation
- Startup, commissioning, and testing of the new boiler system

Project Results
Through careful planning, collaboration, and experienced project execution, the entire replacement was completed successfully without unexpected issues or disruptions to the customer’s operations.
The facility now benefits from increased steam capacity, modern combustion controls, improved reliability, and a boiler system designed to support production for decades to come.
Successful boiler replacements are built on more than quality equipment. They require experienced engineering, careful planning, skilled installation, and a commitment to completing every project safely and with minimal disruption to operations.